Adapting to the pre-set pit and embedded pipeline of the newly-built airportwhile the air supply hose is retracted and relaesed through the lifting platformwith convenience, which can reduce the wear of theairhose, realize fastly air supply, save energy and reduce emissions, and reduce manpower.